SUPER 
ÉTENDARD PLANES

Transportation of 5 Modernised Super Étendard planes (SEM). This was a transportation of 14.8 metres long, 9 metres wide and 4.5 metres high planes that required a specially prepared transport engineering, roadblocks and great logistics support. The combination of 
these elements allowed for a successful task.

HOLCIM – PROVINCE OF JUJUY

A 900 tonnes furnace removal. 
This was a significant engineering development that required great motion using alternative systems. The task was performed in
Puesto Viejo, province of Jujuy.

ACEROS BRAGADO MINING & METALS COMPANY

Assistance in Jaso bridge crane’s lifting, with a capacity of 50/30 tonnes. We developed an auxiliary structure adjusted to the dimensions of ACERBAG S.A.’s ship.
To reach the external extension of the tire track we used two columns and one bracing girder, some load spreading bases, and spires with hinge bearings.
We used two cranes of 300 tonnes simultaneously.

CAMPANA CLEAN FUELS

Transportation of an R-950 
reactor from Puerto de Campana to ESSO refinery.
The piece weighted 480 tonnes, 
was 43 metres long and had a diametre of 5.8 metres.
The load was received from the ship’s hook at Puerto de Campana and was
loaded onto a hydraulic module 
made of 24 lines of side trailer, 
with 16 wheels per axis.
The module was powered by two tractor units, since this was one of the heaviest weighs ever transported in Argentina.