PASEO DEL 
BAJO ROAD

BAJADA DE HUERGO MOTORWAY

Descent towards 25 de Mayo motorway, 
with up to 300 tonnes, using the crane
LIEBHERR LR1600/2 equipped with 
DERRICK SYSTEMS.
It is our country’s most important civil construction in the last decades. It connects Buenos Aires - La Plata motorway to 25 de Mayo and Illia motorways, including green areas of the city of Buenos Aires.

FROM ESTATUA COLÓN TO AEROPARQUE

We work on tailor-made solutions for the transportation of pieces of art, using
detailed engineering planning.

CEMENTOS
AVELLANEDA

PROVINCE OF SAN LUIS

Complex hoisting assistance for the main construction company leading the Engesur UTE project (Olavarría Services – Montcalm).
Recently incorporated equipment was used 
for this service, such as a crawler crane with a hoisting rated capacity of 180 tonnes.

COGENERACIÓN (YPF’S LA PLATA REFINERY)

For Cogeneración’s project in YPF’s La Plata Refinery, we were in charge of the
hoisting and location of the construction’s main pieces. To move the furnace,
two Liebherr cranes were used, with a capacity of 500 and 600 tonnes. They
were used together for verticalization and hoisting. The tasks were performed
under strict safety measures at YPF’s La Plata Refinery.

INVAP

Transportation, hoisting and location of the main piece of the RA10, a
multipurpose atomic reactor built by CNEA (National Atomic Energy
Commission) at the Ezeiza Atomic Centre. One of the country’s biggest cranes was used for this task.

CHINESE AERIAL

Assembling, internal transportation, and hoisting of pieces of up to 220 tonnes
for the Chinese space station in Neuquén, Argentina.

CONUAR - MODULE 8 - CAREM 25  

Atucha Nuclear Power Plant. Hoisting of the CAREM-25 reactor of 114 tonnes
that had a diameter of 19 metres and was 9 metres high. It was performed at
CAREM (Argentinean Power Station of Modular Elements) in Lima, province of
Buenos Aires. For the motion, we used the crane Liebherr LR 1600/2 with a
capacity of 600 tonnes, and the support equipment of the cranes Liebherr LTM.
1250.6.1 and Grove RT-780.

COKE AND YPF TANKERS - LA PLATA

Transportation of pieces of equipment for the construction of a coking plant in
the city of La Plata.

PARQUE ROCA STADIUM

Roofing of Mary Terán de Weiss Stadium, better known as Parque Roca. This
was a great challenge involving two LR 1600 cranes, with a capacity of 600
tonnes that lifted, 79 metres high, pieces of 170 tonnes and 180 metres long.
Wind Power

1
2
3